Nickel 201 is the low-carbon version of Nickel 200. Because of its low carbon content, Nickel 201 is not subject to embrittlement by intergranularly precipitated carbon or graphite when exposed to temperatures of 315 to 760℃ for prolonged time if carbonaceous materials are not in contact with it. Therefore, it is a substitute for Nickel 200 in applications above 315℃. However it does suffer from intergranular embrittlement by sulfur compounds at temperatures above 315℃. Sodium peroxide can be used to change them to sulfates to counteract their effect.
Chinese designation: 纯镍 201 (Nickel 201)
| Element | Min % | Max % |
|---|---|---|
| Ni | 99 | — |
| Fe | — | 0.4 |
| Mn | — | 0.35 |
| Si | — | 0.35 |
| Cu | — | 0.25 |
| C | — | 0.02 |
| S | — | 0.01 |
Chemical composition per the grade specification. Values are nominal; the certified analysis is issued with every order on EN 10204 3.1 documentation.
| Product form | ASTM / EN specification |
|---|---|
| Rod and bar | B 160 |
| Plate, sheet and strip | B 162, B 906 |
| Seamless pipe and tube | B 161, B 829 |
| Welded pipe | B 725, B 775 |
| Welded tube | B 730, B 751 |
| Welding fitting | B 366 |
Nickel 201 (UNS N02201, DIN W. Nr. 2.4061, 2.4068) is a nickel-based alloys grade. Nickel 201 is the low-carbon version of Nickel 200. Because of its low carbon content, Nickel 201 is not subject to embrittlement by intergranularly precipitated carbon or graphite when exposed to temperatures of 315 to 760℃ for prolonged time if carbonaceous materials are not in contact with it. Therefore, it is a substitute for Nickel 200 in applications above 315℃. However it does suffer from intergranular embritt
ROBAN supplies Nickel 201 as rod and bar, plate, sheet and strip, seamless pipe and tube, welded pipe, welded tube, with custom dimensions to your drawing.
Yes. Every order ships with EN 10204 3.1 material certification covering the actual heat analysis. 3.2 documentation is available where the contract requires it.
Stock items ship within 3 to 7 working days. Cut-to-size and forged items typically run 15 to 30 working days depending on quantity and specification. Send us your drawing or enquiry for a firm lead time.
Drawing, grade, dimensions, quantity and delivery date — we price from those.
Request a Quote →Heat analysis certificate issued with every order at no extra charge.
Quality documentation →Shearing, sawing and machining to the tolerances on your drawing.
Capabilities →Buyers often substitute within a family once service conditions, corrosion behaviour or fabrication method narrow the choice.