Request a Quote
Nickel-Based Alloys

Hastelloy C-2000

Hastelloy C-2000 is a versatile corrosion resistant alloy with excellent resistance to uniform corrosion in oxidizing or reducing environments. It resists all acids, especially hydrochloric, sulfuric and hydrofluoric acids, at wide temperature ranges, and also resists pitting corrosion, crevice corrosion and stress corrosion cracking induced by chlorides and other halide solutions.

Chinese designation: 哈氏合金 C-2000

Chemical Composition

ElementMin %Max %
Cr2224
Mo1517
Fe—3
Co—2
Cu1.31.9
Mn—0.5
Al—0.5
Si—0.08
P—0.025
C—0.01
S—0.01
Nibalance—

Chemical composition per the grade specification. Values are nominal; the certified analysis is issued with every order on EN 10204 3.1 documentation.

Product Forms & Standards

Product formASTM / EN specification
RodB 574
Plate, sheet and stripB 575
Seamless pipe and tubeB 622
Welded pipeB 619, B 775
Welded tubeB 626, B 751
Welding fittingB 366
Forged or rolled pipe flange and forged fittingB 462
Billet and bar for reforgingB 472
ForgingB 564

Physical Properties

Density
8.50 g/cm3
Melting range
1328-1358℃

Applications of Hastelloy C-2000

  • Chemical process industry reactors, heat exchangers, columns and piping
  • pharmaceutical industry reactors and dryers
  • and flue gas desulfurization system components.

Frequently Asked Questions

What is Hastelloy C-2000?

Hastelloy C-2000 (UNS N06200, DIN W. Nr. 2.4675) is a nickel-based alloys grade. Hastelloy C-2000 is a versatile corrosion resistant alloy with excellent resistance to uniform corrosion in oxidizing or reducing environments. It resists all acids, especially hydrochloric, sulfuric and hydrofluoric acids, at wide temperature ranges, and also resists pitting corrosion, crevice corrosion and stress corrosion cracking induced by chlorides and other halide solutions.

What forms of Hastelloy C-2000 do you supply?

ROBAN supplies Hastelloy C-2000 as rod, plate, sheet and strip, seamless pipe and tube, welded pipe, welded tube, with custom dimensions to your drawing.

Do you provide EN 10204 3.1 material certificates for Hastelloy C-2000?

Yes. Every order ships with EN 10204 3.1 material certification covering the actual heat analysis. 3.2 documentation is available where the contract requires it.

What is the lead time for Hastelloy C-2000?

Stock items ship within 3 to 7 working days. Cut-to-size and forged items typically run 15 to 30 working days depending on quantity and specification. Send us your drawing or enquiry for a firm lead time.

RFQ

Send the specification

Drawing, grade, dimensions, quantity and delivery date — we price from those.

Request a Quote →
MTC

EN 10204 3.1 included

Heat analysis certificate issued with every order at no extra charge.

Quality documentation →
CUT

Cut to your size

Shearing, sawing and machining to the tolerances on your drawing.

Capabilities →

Related Grades in Nickel-Based Alloys

Buyers often substitute within a family once service conditions, corrosion behaviour or fabrication method narrow the choice.